
E-S 1000D Series Instruction Manual
Installation of Operator—Push-to-Open
2.13
Before permanently attaching any brackets, be sure to test arm motion
and clearance.
13) WITH THE GATE IN THE OPEN POSITION
measure 44” from the center of the hole on
the boomerang bracket to the center of
the hole on the gate bracket - this should
be the position of the gate bracket on the
closed gate. [See Fig. 7]
14) Additionally measure and mark the
gate mounting bracket so that it is vertical-
ly centered on the horizontal bar.
15) To ensure that the gate mounting
bracket is leveled, secure one side of the
bracket, check for levelness, and secure
the other side with provided carriage bolts,
nuts, and washers. [See Fig. 8]
Fig 8
Fig 7
44”
Comentarios a estos manuales